Recently, the United StatesThe Georgia Port Authority has officially received approval from the US Army Corps of Engineers to invest $2.3 billion to build a large container terminal at Savannah Port. Savannah Port is the fourth largest container port in the United States and the second largest container port on the East Coast of the United States. By 2025, it will achieve a container throughput of 5.7 million TEUs, ranking 38th in the world.
The new dock is located on Hutchinson Island,Across the river from the existing Garden City Pier at Savannah Port. Project planning and construction3A deep-water berth,Covering an area of 350 acres (approximately 141.6 hectares),Capable of unloading ultra large container ships,The designed annual throughput capacity is 3.5 million TEUs. The terminal is planned to be developed in stages, and the first phase of the project is expected to take place in2030It was put into operation around the beginning of the year.
This project is the core of Georgia Ports Authority's future investment plan, which will invest nearly $5 billion to upgrade port infrastructure, including adding five large container ship berths at Savannah Port and expanding the roll on/roll off capacity of Brunswick Port.
At present, the container throughput capacity of Savannah Port has reached 7.75 million TEUs. In addition to the newly built terminal, GeorgiaThe Port Authority has also invested approximately $1.6 billion to expand and renovate the existing ocean terminal, with plans to significantly increase its annual throughput capacity from the current 200000 TEUs to approximately 1.75 million TEUs by 2028. The President of the Georgia Ports Authority stated that in the future, the annual throughput capacity of Savannah Port will reach 12 million TEUs.